Wall with high window, Bathroom for Employee, Machine Room, no piping should be covered before passing the hydrostatic or pneumatic test; to cover it the authorization will be obtained in writing of mexican petroleums.
Third-floor plan drawing s
Side view of fire bottle c
detail 5 wall
Floor plan detail drawing
Detail of rcc bench cad dr
Different type of Autocad
Section view with first fl
3 cubic meter water tank p
Gym design cad drawing is
Traditional Pillar Design
Detail drawing of compound
Building Plan and Service