Sports center architecture project. RAILYARD, PLATFORM OF LOADING AND DOWNLOADING, CAMERA LATER, STORE FOR 14 DAYS. TOTAL 56 TONNES, PROPULSOR OF COMPRESSED AIR. elevation & section with lay-out detail.
Basket detail view with vi
Drawing of basketball cour
Basketball court top view
Football goal plan detail
Gym building floor plan di
CAD drawings details of sp
All sided elevation and se
Basketball court ground de
Sports center with swimmin
Detail of sports area plan
Hatching Backboads plan la
Sports swimming pool cente