subsoil drainage plan, detail of perforated pipe, foundation plan, plan elevation b - b, details of measuring gauge, no fines concrete directly below footings to be replaced by 75 thick mass concrete etc.
403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India
+91 9898748697
support@cadbull.com