The Lighting wire fixture installation in the wall and slab drawing shows detail of the down conductor for curtain wall bonding, earth bonding for raised floor metallic work, 25x3mm tape, fire barrier, terminal box with a plug-in type ceiling rose. It shall be the contractor's responsibility to ensure the complete coordination of all services. The lamps and luminaries shall be supplied and installed under this contract as per the light fitting specification. For the location of emergency and exit signs, refer to the civil defense drawings. Download the free light fixing detail DWG file.
403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India
+91 9898748697
support@cadbull.com