HVAC Duct Work Layout plan for First floor of Commercial Building.

<p>This Architectural Drawing is HVAC Duct Work Layout plan for First floor of Commercial Building. The size of ductwork affects the amount of airflow and its velocity and is very important in how well the HVAC system operates.&nbsp;<strong>Rectangular ducting can come in various sizes from 3&rdquo; x 7&rdquo; up to 35&rdquo; x 40&rdquo;; and round ducting can be anywhere from 4&rdquo; to 41&rdquo; in diameter</strong>. <strong>Duct CFM Calculation Formula is</strong></p> <div> <ol> <li style="list-style-type: inherit;">Room CFM = (Room load/Whole house load) ? Equipment CFM.</li> <li style="list-style-type: inherit;">24,000 BTUs &divide; 12,000 BTUs in 1 ton = 2 tons ? 400 CFM per ton = 800 CFM.</li> <li style="list-style-type: inherit;">Room A = (2,000 BTUs &divide; 24,000 BTUs) ? 800 CFM.</li> <li style="list-style-type: inherit;">Room A = 66.67 CFM.</li> </ol> </div>

Sponsored Links

File Details

Details about publisher and file.

File type

DWG

Category

Dwg Cad Blocks

Sub Category

Autocad Plumbing Fixture Blocks

File ID

253299

Sponsered Links

Publisher

Eiz Luna

Architect

Contact Us

Address

403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India

Phone

+91 9898748697

E-mail

support@cadbull.com