Delay joint of basement slab.

This Architectural Drawing is AutoCAD 2d drawing of Delay joint of basement slab. Expansion joints are virtually never needed with interior slabs, because the concrete doesn't expand that much—it never gets that hot. Expansion joints in concrete pavement are also seldom needed, since the contraction joints open enough (from drying shrinkage) to account for temperature expansion. Joints should be sawed as soon as the concrete can withstand the energy of sawing without raveling or dislodging aggregate particles. For most concrete work, cutting should take place within the first 6 to 18 hours and never beyond 24 hours. For more details and information download the drawing file.

Sponsered Links

File Details

Details about publisher and file.

File type

DWG

Category

Detail CAD Blocks & CAD Model

Sub Category

Interiors Detail CAD Blocks & CAD Model

File ID

254534

Sponsered Links

Publisher

Eiz Luna

Architect

Contact Us 

Address

403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India

Phone

+91 9898748697

E-mail

support@cadbull.com