<p>This Architectural Drawing is AuotoCAD 2d drawing of Basement wall delay joint. Space joints (in feet) no more than <strong>2-3 times the slab thickness</strong> (in inches). Concrete control joints should be no less than ¼ of the total thickness of the slab (1” deep for a 4” thick pour) and placed no less than 2-3 times (in feet) the thickness (in inches) of the slab (<strong>8-12 feet apart for a 4” thick pour</strong>). For more details and information download the drawing file.</p>