This AutoCAD DWG drawing presents a single-line greenfield grounding diagram designed for telecom and electrical infrastructure projects. The layout clearly illustrates the complete grounding network connection from antenna systems to the grounding perimeter. The drawing includes final antenna systems connected through RRUs, upper and lower busbars, vertical and horizontal cable tray routing, and proper grounding continuity. The upper busbar is shown mounted on a vertical tray at 50 cm from the bottom of the antenna structure, ensuring an accurate elevation reference for site execution. Lower busbar placement above the horizontal tray is also detailed for safe current dissipation and standardized grounding practice.
The drawing further covers existing and final box control units, main grounding bus MGB routing, EGB placement on BTS foundation, and final grounding stick rod connection integrated with the existing grounding perimeter. Additional elements such as the KWH meter, vendor-provided equipment, and BTS FRST media grounding are clearly labeled for coordination between electrical and telecom systems. This DWG file is suitable for architects, civil engineers, electrical consultants, and contractors who require a clear, construction-ready grounding reference for greenfield site development and professional AutoCAD-based electrical documentation.
403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India
+91 9898748697
support@cadbull.com