Second Floor of elevator pit in AutoCAD, dwg file.
<p>This Architectural Drawing is AutoCAD 2d drawing of Second Floor of elevator pit in AutoCAD, dwg file. <strong>Sidewall spray sprinklers are required to be installed at the bottom of each elevator hoistway at a maximum of 2 ft (600 mm) above the floor of the pit</strong>. The exemption to this is for hoistways that are enclosed, noncombustible, and do not contain combustible hydraulic fluid.</p>