The fire water tank and pump room drawing presents a complete layout of the fire protection water supply system with clearly marked components and pipeline connections. The plan shows a fire water tank with 90 cubic meters of capacity, a float valve, a vortex plate, a suction line, a drain line, and a municipal water supply connection. The pump room area includes the jockey pump, main pump, diesel pump, suction header, discharge header, pressure gauges, control panels, and valve arrangements. All pipe diameters, flow directions, and equipment positions are accurately shown with technical labeling and dimension references.
The sectional views A-A and B-B illustrate the internal arrangement of the water tank, pump foundation, discharge system, drainage line, and fuel tank connection. The drawing highlights exhaust routing, fuel supply and return lines, isolation valves, strainers, and flow meters. Water level indication, overflow piping, and drainage systems are clearly represented. The layout also defines pump room space, equipment spacing, and maintenance access areas. All elements are organized according to fire safety system requirements, matching the uploaded image for engineering planning, installation guidance, and construction documentation reference.
403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India
+91 9898748697
support@cadbull.com