water sewer plant

- The outer sections of the construction that cross the areas of vehicular traffic, will be buried 1.0 m from the ground level of the pavement. For areas without vehicular traffic, they will be buried 0.5 m away
- Material changes “PVC-Cu” will be executed using appropriate special parts.
- In the different bathrooms, in general the internal stopcocks will be chrome-plated with bell and body, the showers must carry chayas according to the architecture specification.
- The artifacts will be installed according to the manufacturer's specifications and project indications, each of these must have an individual stopcock according to the model specified by architecture.

Sponsered Links

File Details

Details about publisher and file.

File type

DWG

Category

Construction Cad Drawing CAD Blocks & CAD Model

Sub Category

Construction detail cad drawing CAD Blocks & CAD M

File ID

81133

Sponsered Links

Publisher

Eiz Luna

Architect

Contact Us 

Address

403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India

Phone

+91 9898748697

E-mail

support@cadbull.com