Foundation based plan of residence project

1.- Foundation based on running shoes of stone breaststroke,

settled with mortar; mortar-sand; prop: 1: 5, combined

with the indicated separation.

2.- Height of the running shoe variable.

3.- The foundation level of the foundation will be made up

Find support in the rugged terrain.

4.- The shoes are moved on concrete template f'c

100 kg / cm2.

5.- The staff moves on silty soil with capacity

load of 6 ton / m2.

6.- The pavements will be reinforced concrete with electro-welded mesh

6 x 6 - 6/6 and they are displaced on filling of the same excavation,

compacted to 90% of its p.v.s.

7.- The castles will be displaced from its foundation with an embed

minimum of 40 cm.

8.- The walls will be red brick annealed 7-14-21.

9.- Type of falsework for common concrete elements.

MATERIALS FOR CONCRETE ELEMENTS

a) Premixed concrete f'c 200 kg / cm2, with coating 12 cm.

(The concrete elements will be vibrated and cured for a minimum

24 hrs)

b) Concrete template, made on site f'c 100 kg / cm2.

c) Steel f'y 4200 kg / cm2

d) Plain Steel fy 2530 kg / cm2

e) Electrowelded mesh 6 x 6 - 6/6 f and 5000 kg / cm2

FREE COATINGS

a) Slabs and Trabes 2 cm

b) Castles and Dalas 2 cm

c) Insulated shoes 2 cm

Sponsored Links

File Details

Details about publisher and file.

File type

DWG

Category

Construction

Sub Category

Construction Detail Drawings

File ID

82173

Sponsered Links

Publisher

Eiz Luna

Architect

Contact Us

Address

403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India

Phone

+91 9898748697

E-mail

support@cadbull.com