concrete will be used whose compaction will not be less than 0.80 with revenance of 5 to 10 cm. and added thick with size special care will be taken ceiling the road to prevent they have loose oxide before depositing the concrete, the clamps will be translated or solid.
403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India
+91 9898748697
support@cadbull.com