One-layer top form work and reinforcement plan
Description
One-layer top form work and reinforcement plan. The steel bars without diameter are all ‚10-200, the plate is distributed with reinforced concrete ‚8-200, The embedded parts of the balcony and the air conditioner outside the board are shown in the details.
File Type:
DWG
File Size:
2.4 MB
Category::
Construction
Sub Category::
Reinforced Cement Concrete Details
type:
Gold
Uploaded by:
Eiz
Luna

