Corporation is the nodal agency for the project which will be built through public–private partnership on a 'design, build, finance, operate and transfer' basis. Airport Lay-out Detail Download file, Airport Lay-out Detail Design.
Frontal and posterior elev
Modern Airport Design
CAd drawings details of pe
Sectional detail of taxiwa
Airport terminal area is s
2d view of airport parking
2 d cad drawing of airport
Aircraft platform project
Airport terminal building
Airport building detail CA
Control Tower building str
Airport building structure