Tank Structure Basement 3.50m Chamber Substation Roof Detail

Tank Structure Basement 3.50m Chamber Substation Roof Detail
Profile

Uploaded by:

Jafania

Waxy

Description

Tank Structure Basement 3.50m Chamber Substation Roof Detail drawing provides a complete infrastructure layout including planta cisterna, planta sotano camara pluvial with 3.50m height, and detailed planta subestacion arrangement. The basement floor plan defines structural walls, equipment zones, circulation space, and pump chamber alignment. CTO tableros bombas layout and cell of transformation detail are clearly drafted with equipment base positions and service access. Sections such as corte A A, corte B B, corte C C, and corte 1 1 illustrate vertical coordination between foundation, basement slab, and roof structure. Elevacion A, elevacion B, and elevacion C show facade proportions and height references for the substation enclosure.

Profile

Uploaded by:

Jafania

Waxy

find Latest

Related Files