Typical beam to existing pile cap connection detail drawing is given in this AutoCAD file. Links are provided. Straight bars are per beam schedule drilled into existing pile cap with hltire 500 injection mortar, and other details are mentioned. For more details download the AutoCAD drawing file from our website.