Corporate Building Project Detail


Description

AS A FIRST AND MOST IMPORTANT CONCLUSION, WE CAN SAY THAT THE GROUND DOES NOT HAVE A GOOD LOCATION WITH REGARD TO SUNNYING, AS THE PORTERIOR PART OF THE CONSTRUCTION WOULD BE MORE BENEFICIATED THAN THE FRONTAL PART, AND SEEING EVEN THAT IN GREAT PART OF THE AFTERNOON THE FRONT OF THE LAND IS COMPLETELY SHADED, AS TO THE WIND IT CAN BE SAID THAT CAN BE USED FOR A NATURAL VENTILATION SINCE ITS DIRECTION THAT IS THE NORTHWEST GOES DIRECTLY TO THE FRONT OF THE LAND, BUT IT CAN ALSO BE A DISADVANTAGE WHY IN ADDITION TO BE SHADING THE FRONT WITH THE WIND CAN CREATE A COLD SPACE. HOWEVER WILL BE A BUILDING OF 6 FLOORS WILL NOT BE OPACED BY THE BUILDINGS OF ITS AROUND AND THAT THOSE THAT ARE IN THE AREA ARE NOT SOREPASAN OF 6 FLOORS AND THE MORE CERNANES OF 3 TO 4 FLOORS, THIS MAKES THAT NOT ONLY RESALE THE BUILDING AESTHETICALLY, BUT AS A HEIGHT AND WHY SHALL NOT BE COVERED BY SHADOW OF OTHER BUILDINGS. ANOTHER IMPORTANT ASPECT IS THE VEHICULAR ACCESS TO THE GROUND FOR THE REASON THAT IT ONLY HAS AN IDA RIDE, WHICH HAZARDS THE VEHICULAR ACCESS TO THE TERRAIN AND WHICH CAN OCCUR VEHICULAR CAUSES AT THE TIME OF MAKING THE REVERSE TURN.




File Type: DWG File ID: 25529

Uploaded by:


K.H.J Jani
india

Similar Files