PE Cell Settler ABR System Fabrication Drawing IPAL DWG File
Description
This AutoCAD DWG file provides a detailed IPAL fabrication drawing designed for a wastewater treatment system serving 11 to 15 households, equivalent to approximately 45–60 users. The drawing clearly illustrates the PE cell-based IPAL system, including one settler chamber and four ABR chambers, arranged for efficient sewage flow and treatment. All chambers are accurately dimensioned, showing internal layouts, chamber spacing, and structural alignment. The drawing includes precise details for Ø4-inch inlet and outlet pipelines, Ø2-inch gas release pipes, excavation depth, sand bedding, and a 10 cm thick working floor, ensuring clarity for on-site execution.
Additional sections cover elevation levels, chamber depth, backfilling requirements, and ventilation pipe height up to 3.00 meters, supporting proper system performance and durability. The layout is suitable for residential clusters, institutional buildings, and small community sanitation projects. Clear annotations and scale-based detailing help engineers and contractors understand construction sequencing, pipe routing, and installation accuracy. This DWG file is fully editable and compatible with AutoCAD and other CAD software, making it a reliable resource for civil engineers, architects, sanitation planners, and builders who require professional IPAL system drawings for planning, approval, and execution.
File Type:
DWG
File Size:
477 KB
Category::
Mechanical and Machinery
Sub Category::
Mechanical Engineering
type:
Gold

Uploaded by:
john
kelly

