This hospital plumbing layout plan CAD drawing illustrates a detailed rainwater drainage and water management system designed for efficient hospital infrastructure performance. It includes a structured network of PVC pipe 100 mm lines connected with inspection chambers 60x60 for proper maintenance and flow control. The layout shows rainwater collection chambers integrated within the site plan to ensure effective harvesting and drainage management. Open raised gutters and waterproof gutter details are provided for controlled surface water movement and leakage prevention.
403 Fortune Business Hub, Beside Science City, Sola, Ahmedabad - India
+91 9898748697
support@cadbull.com