1st Basement Firefighting Layout with 150mm and 250mm Pipe Plan DWG

1st Basement Firefighting Layout with 150mm and 250mm Pipe Plan DWG
Profile

Uploaded by:

Liam

White

Ratings & Reviews

No Reviews Yet

Be the first to share your experience with this product. Your review helps others make better decisions!

Description

This AutoCAD DWG file presents a detailed 1st Basement firefighting layout for Zone 4, covering Residences N01, N02, N06, and N07 at a scale of 1:200. The layout includes a comprehensive plan for the firefighting system, featuring a 150mm main sprinkler pipe, 100mm dry standpipe T A and T B risers, 250mm primary chilled water supply (CHWS) pipe from DCP, and 250mm secondary chilled water return (CHWR) pipe to the building. This file provides detailed routing across parking and ramp areas, showing full integration with the building's firefighting system. The plan highlights key firefighting components such as T A and T B risers, breeching inlet 4-way connections, fire hose reels, landing valves, inspector test connections, flow meters, and heat exchangers.

Tags

#firefighting layout#basement firefighting system#AutoCAD DWG firefighting#sprinkler system layout#pipe plan drawing#fire pump room coordination
Profile

Uploaded by:

Liam

White

Ratings & Reviews

No Reviews Yet

Be the first to share your experience with this product. Your review helps others make better decisions!

find Latest

Related Files