Three-layer structure floor Construction plan

Three-layer structure floor Construction plan

Tags

#Three-layer structure floor Construction plan

Ratings & Reviews

No Reviews Yet

Be the first to share your experience with this product. Your review helps others make better decisions!

Description

 

Three-layer structure floor Construction plan, Unspecified beam top elevations are 11.110m., Indicates that the steel beam is hinged to the connected beam. The remaining unspecified beam-column and beam-to-beam connections are just connected.

Profile

Uploaded by:

Eiz Luna

Tags

#Three-layer structure floor Construction plan

Ratings & Reviews

No Reviews Yet

Be the first to share your experience with this product. Your review helps others make better decisions!

find Latest

Similar Files