Sports center architecture project. RAILYARD, PLATFORM OF LOADING AND DOWNLOADING, CAMERA LATER, STORE FOR 14 DAYS. TOTAL 56 TONNES, PROPULSOR OF COMPRESSED AIR. elevation & section with lay-out detail.
Double sports court floor
Wide Stadium cad drawing i
Stadium design cad drawing
Sports ground drawings det
Elevation and section Blea
Ceiling plan of Coliseum a
Family cum children’s ga
NU-2491 model design with
2d cad drawing of losa mul
Sport Center Building Desi
Rim plan dwg file
Sport Centre Lay-out Detai