- The outer sections of the construction that cross the areas of vehicular traffic, will be buried 1.0 m from the ground level of the pavement. For areas without vehicular traffic, they will be buried 0.5 m away
- Material changes “PVC-Cu” will be executed using appropriate special parts.
- In the different bathrooms, in general the internal stopcocks will be chrome-plated with bell and body, the showers must carry chayas according to the architecture specification.
- The artifacts will be installed according to the manufacturer's specifications and project indications, each of these must have an individual stopcock according to the model specified by architecture.