Traffic management stage one layout plan of city cad drawing details that includes a detailed view of installation barrier traffic stage 1 period 3 days with relocate existing three in median curb and street lighting period 7 days and demolish concrete median curb period 7 days details, construction paving concrete road period 7 days with construction base slab silo bentonite details and remove bridge overpass period 3 days details and much more of city details.