Zone of location of the grids (filters), to be determined with the results of the electrical diagrams. Cement ring for insulation of brackish and contaminated aquifers.
A section and elevation vi
MEP lightning Installation
Floor-pivot-detail
The Wall section of the 52
The layout of the beams fo
Exterior enclosure section
Section of Service water p
Masonry reinforcement deta
Raft foundation structure
The front side section vie
Structural drawing provide
Ramp section details are a