house electrical installation cad file


Description

1. all electrical works shall be done in strict conformity with the latest edition of the philippine electrical code (pec) the requirement of the manila electric company (meralco), the rules & regulations of local and national authorities concerned in the emforcement of electrical laws .
2. all electrical works herein shall be done by qualified electrician and shall be under the direct supervision of duly licensed, electrical engineer.
3. all materials & equipments to be used shall be brand new & approved type for both intended location & purposes.
4. mounting height shall be as follow (from finish floor line to the center of devices.
     lighting panel board = 1500mm
     convenience outlet (co) = 300mm
     light control switches = 1480mm




File Type: DWG File ID: 81217

Uploaded by:


Eiz Luna
New-Zealand

Similar Files