This Architectural Drawing is AutoCAD 2d drawing of Second Floor of elevator pit in AutoCAD, dwg file. Sidewall spray sprinklers are required to be installed at the bottom of each elevator hoistway at a maximum of 2 ft (600 mm) above the floor of the pit. The exemption to this is for hoistways that are enclosed, noncombustible, and do not contain combustible hydraulic fluid.